[NMR Pipe Protector Verification Results] Fenchurch Building
Nine days after installation, the iron concentration dramatically decreased to 0.5 mg/l! A proven case of pipe rehabilitation through the black rusting of red rust.
The hot water supply piping in this office building uses galvanized steel pipes (SGP pipes) as the piping material, and serious red water due to corrosion deterioration occurred throughout the building. According to water quality tests, the iron content in the hot water supply in the early morning was high at 5.2 mg/l, so a "NMR Pipe Protector" was installed to prevent red rust and extend the life of the hot water supply piping. In the water quality test conducted nine days after installation, the iron content dramatically decreased to 0.5 mg/l, and even 43 days after installation, the iron content remained low at 0.5 mg/l. [Effects After Installation] ■ The water quality test nine days after installation showed a dramatic decrease in iron content to 0.5 mg/l. ■ Even in the water quality test 43 days after installation, the iron content remained low at 0.5 mg/l. ■ The leaching of red rust into the water stopped, proving the rehabilitation of the piping through the black rust formation. ■ By preventing external corrosion, the piping became usable as long as the building remains standing. *For more details, please refer to the PDF document or feel free to contact us.
- Company:日本システム企画 東京本社
- Price:Other